Feature | BRT | LRT |
---|---|---|
Dedicated roadway for operations | ||
Off vehicle fare purchase | ||
Low-floor vehicles with level boarding | ||
Traffic signal priority or preemption | ||
Operates on roadway with no rail or overhead catenary | ||
Operates on rail, powered by electric overhead catenary wires | ||
Frequent service at substantial transit stations | ||
Separately branded vehicles | ||
Maximum cars per configuration | 2 | 4 |
Maximum passengers per train/bus | 150 | 220 |
Travel Speed | 55mph | 55mph |
Construction Cost (2009$) | $1.0B | $1.4B |